GRTC Linear Accelerator

← Back to the Portfolio

795 S.F. Interior Renovation/Refurbishment to replace the existing Linear Accelerator.

Scope included replacing doors, adding new structural supports, upgrading finishes, and installing all infrastructure for a new Varian Linear Accelerator. Demolished all existing devices and fixtures. Installed new electrical & voice/data outlets, new lighting and lighting controls, new fire detection devices, and all infrastructure for the Linear Accelerator equipment package.

M/P scope included an upgrade of existing HVAC & plumbing fixtures.

  • Date: 2014 - 2015
  • Client: GRMC
  • Filed under: HealthCare, Visualization